Trusted to move the biggest things Since 1945

650 Tonne Shiploader

Posted on by Jessica Christensen
Client: Ramsey Machine | Location: Sydney BC | Completion Date: 2010

Project Highlights:

Transport of the 650 tonne Shiploader unit included design of 70 tonne steel support frame which evenly distributed the load to the hydraulically floating 192 tires, development of the jacking procedure, and evaluation of the wharf structure’s ability to support the loads.

Services:

  • Design, fabrication and installation of the custom transport frame.
  • Transportation of the massive load by land and sea from Sydney on Vancouver Island to the Kinder Morgan Terminal on the North Shore of Vancouver Harbour.
  • Co-ordination of several authorities having jurisdiction including Victoria Airport Authority.
  • Floating Load-Out to barge in both Victoria and Vancouver harbours.
  • Marine securement for barge transport.
Posted on by Jessica Christensen This entry was posted in Featured Projects, Industrial Equipment Projects. Bookmark the permalink.

Just Some of our Structural Transport Services

  • Structural
    Engineering Services
  • Engineered
    Heavy Lift
  • Synchronized & Unified
    Hydraulic Jacking
  • Industrial
    Jacking
  • Project Cargo
    Transportation
  • Oil & Gas
    Vessel Transport
  • Transformer
    Moving & Installation