Spirit Trail Overpass

Posted on by Jessica Christensen
Client: Capitol Steel | Location: North Vancouver BC | Completion Date: September 2014

Project Highlights:

North Vancouver residents watched the new Spirit Trail Pedestrian/Cyclist Pathway near completion with the installation of the new Pedestrian Bridge over the Lower Level Road. Supreme Structural Transport was happy to be a part of the erection of the Stantec designed structure. The fabricator, Capitol Steel, was also pleased to see their handiwork installed safely over this North Shore roadway.

Services:

  • Transportation of the partially assembled structure from a staging area located approximately 2 km from the bridge erection site.
  • Fabrication of custom support plates to carry the bridge only on the intended bearing locations.
  • Delivery to under-hook at the Bridge erection site.
Posted on by Jessica Christensen This entry was posted in Featured Projects, Industrial Equipment Projects. Bookmark the permalink.

Just Some of our Structural Transport Services

  • Structural
    Engineering Services
  • Engineered
    Heavy Lift
  • Synchronized & Unified
    Hydraulic Jacking
  • Industrial
    Jacking
  • Project Cargo
    Transportation
  • Oil & Gas
    Vessel Transport
  • Transformer
    Moving & Installation