In March of 2009 we were contracted to move these transformers from a rail siding in Duncan, BC to a BC Hydro Substation 2 kilometers away. These transformers were 200 and 220 tons respectively, and had to be placed, and joined together, with a 1 millimeter tolerance.
|
|
![]() |
|
|
|