Industrial Projects
Shiploader
Transport a new 650 Mton weight shiploader from Sidney - 2 kilometres through Victoria Airport - on to a barge, to the North Vancouver Terminal of Kinder Morgan
BC Place Structural Steel
Received and delivered upwards of 200 loads ranging from 35Mton to 150Mton from ship side and rail siding to BC Place
Solar Coaster Chairlift
Solar Coaster chairlift drive station at the top of Blackcomb Mountain approx. 250’ downhill to make room for the new Peak to Peak Gondola that will span the Whistler to Blackcomb Mountains. 80’ long, weighing 170 tons. Very high centre of gravity, all the heavy machinery is in the roof area.
RAV Line / TBM
Transporting three pieces of tunnel boring machine (TBM) for Canada Line in Vancouver, 20’ diameter weighing 110 tons. We used a 400 ton capacity transporter to minimize axle loadings as Vancouver's sewer and water mains are very old and brittle.
UBC Rowing Club Launch
We loaded two 400 Tonne concrete floats with buildings attached, to a floating dry-dock for launching.